Trailing suction hopper dredger
|
Bin capacity |
3,906 m3 |
|
Maximum dredging depth |
25 m |
|
Year of construction |
1995 |
|
Owner |
Van Oord |
|
Bin capacity |
3,906 m3 |
|
Maximum dredging depth |
25 m |
|
Year of construction |
1995 |
|
Owner |
Van Oord |
Maasvlakte 2 is a project of Havenbedrijf Rotterdam N.V.