Construction
Contract
Construction approach
Physical characteristics
|
|
|
Facts and figures
| | | | General | | | Total area | ca 2,000 hectares | | Area for industrial sites | 1.000 hectares | | Space needed for infrastructure | 190 hectares | | Space needed for sea defences (above sea level) | 165 hectares | | Space needed for fairways and docks | 490 hectares | | | | | Division of area | | | Economic activities | | | Container storage and througput | 630 hectares | | Chemicals | 190 hectares | | Distribution | 180 hectares | | Total capacity container througput | 17 million TEU* annually | | | | | Infrastructure | | | Roads (2 x 2-lane) | 13 kilometres | | Rail (double, rail service centre) | 14 kilometres | | Quay walls | 13 kilometres | | | | | Materials required | | | Sand, 1st phase construction (2013) | 240 million m³ | | Maximum total quantity sand required (2033) | 365 million m³ | | | | | | | Lenght of sea defences | | | Soft sea defence | 8,4 kilometres | | Hard sea defence | 2.4 kilometres | | Transition between soft and hard sea defence | 1.4 kilometres | | | | | Access for shipping | | | Lenght of navigation channel | 10 nautical miles | | Draught | up to 20 meter | | Width of port entrance | 600 meter | | Diameter turning basin for ships | 700 meter | | | | | * TEU stands for Twenty-foot Equivalent Unit, and is the unit of measurement for containers | |
|
|
|